Chuck Adapter for installation of the barrel screws. Use a drill with a depth sensitive nose piece or a variable clutch
adjustment. The barrel end of the Pos-I-Tie® is placed into the reusable chuck adapter.
For steel studs, drill the Pos-I-Tie® through the exterior insulation and into the metal stud. Use a drill with 1500 - 2000 RPM. Do not over-torque!
Sleeve Tool - Allows for drilling hole through up to 2-1/2" insulation and using the same sleeve tool for placement of the Chuck Adapter so you can use one drill for both operations. Pre-drill a 3/16" (4.76 mm) hole to a depth of 2" (51
mm). Slide the Sleeve tool over the drill bit and insert the CMU/Concrete Screw into the chuck adapter. Torque screw
into the pre-drilled hole.
The Chuck Adapter and Sleeve Tool are sold separately.