PROJECT OVERVIEW
BUILDING600-Unit Multi-Family Development
BUILDERThe Wasatch Group
LOCATIONHerriman, UT
AEROBARRIER CONTRACTORSAeroBarrier West
GOALReduce energy consumption by 50% in a cost-effective manner to allow the solar-powered, all electric community to reach its goals
PRE LEAKAGE10 ACH50 average per unit
POST LEAKAGE< 1 ACH50 per unit
RESULTSThe design team did not overcompensate HVAC system size to hit performance goals, cutting HVAC costs in half and saving upfront capital. This helped qualified the project for rebates delivering a 150% return on investment. The impact of this air sealing technology has made AeroBarrier a standard on every Wasatch Group project.